Bell System bell free Manual de usuario Pagina 24

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 23
24
Bell res
English
Instructions for use and installation instructions
3.4 GENERAL SERVICES
3.4.1 The Fume Channel/Combustion Air Intake
The combined fume channel and combustion air intake requires one of the following
Barbas concentric fl ue system confi gurations.
Important: Due to the high temperature of the outer walls
(approx. 150°C), no fl ammable materials may be
located or used in the vicinity of the fl ue system.
After installation, encase the entire concentric fl ue
system with a heat resistant material between the
oor of the fi rst storey and the outlet.
Ventilate the covered concentric fl ue by fi tting a
grid near the fl oor and ceiling (on each fl oor).
Do not insulate the concentric fl ue.
Use the universal wall/fl oor support Ø150 mm
to attach the covering of the concentric fl ue system
[Ø100 mm - Ø150 mm], see 3.4.2, drawing number 36.
Figure 7: Application universal wall/fl oor support Ø150 mm
From the fl oor of the fi rst storey as far as the vent
36
36
Use as a wall support Use as a fl oor support
Vista de pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 55 56

Comentarios a estos manuales

Sin comentarios